Pressure Lock Gate Operating Instructions:
1.
Raise unit retainer channel (A) to vertical position
and secure
2.
Extend gate until rubber bumpers touch the walls
3.
Lower the male lock channel (B) (with pin) until
it rests on carriage channels within guides and
locking bracket
4.
Lower female lock channel (C) (with adjustment
holes) until it rests within the male lock channel
with pin. Pin need not engage a hole in female
lock channel.
5.
Raise both channels (be careful to avoid pinching
hands) until pin engages the hole immediately
to the right of the pin. Applying moderate pressure,
push both channels down until they rest within
guides and locking bracket. Padlock in position.
Note:
Do not attempt to increase locking pressure by
engaging a hole more distant from pin than that
described in step 5. Excessive pressure may develop. |